Mariposa VII, a 7-storey multi-family building

Mariposa VII, a 7-story multifamily project, fabricated at Douglass Colony's headquarters using FRAMECAD and shipped directly to the jobsite where the building was erected in a total of 40 working days.

Date: 05 Nov 2018

Mariposa VII, a 7-storey multi-family building

The Project 

This seven storey multifamily project was built in Denver, CO with two levels of podium and five upper levels of cold formed steel .  Douglass Colony supplied the pre-panelized metal stud wall framing and offered a turn-key solution with diversified builders as the contracted drywaller.All 422 load-bearing wall panels for levels three through seven of this 7-story (five levels on two levels of podium) project was fabricated at Douglass Colony's headquarters in Commerce City using FRAMECAD and shipped directly to the jobsite where the building was erected in a total of 40 working days, including all wall panels, flooring systems, and detailing with concrete poured and cured.

The Result

Mariposa VII, a 7-story (five levels on two levels of podium) multifamily project was fabricated at Douglass Colony's headquarters in Commerce City using FRAMECAD and shipped directly to the jobsite where the building was erected in a total of 40 working days, including all wall panels, flooring systems, and detailing with concrete poured and cured.

A total of 131,700 lbs of steel was used

  • 33,860 lbs of 14-gauge
  • 49,000 lbs of 16-gauge
  • 48,840 lbs of 18-gauge

The building included a total of 422 panels. All panels were fabricated at the Douglass Colony headquarters in Commerce City, CO in the 6-inch profile.

Two levels of podium

  • Level 3: 81 panels
  • Level 4: 81 panels
  • Level 5: 81 panels
  • Level 6: 81 panels
  • Level 7: 98 panels 

Each level took only 7 days to complete  2 days to assemble and erect the wall panels and 5 days dedicated to finalise the floor system, the detailing on the floor deck, and the concrete. First panel was set on June 21st, 2016 and panels were delivered in 2-week intervals after that (after concrete had completely dried on each level) 

The benefits of the FRAMECAD Technology include:

  • Total design flexibility
  •  1 & 2 hour UL assemblies
  •  Simplified field erection
  •  Complete turn-key solution
  •  Construction in ¼ of the time

If you would like to learn more about Douglass Colony, click here.

More Customer Story

Previous of 10 Next
Page 3 of 10
  • FRAMECAD and Intellisteel Partner for Disruption

    A partnership between FRAMECAD and Intellisteel is poised to disrupt the construction industry in the U.S. for years to come. Together, these two innovative companies make construction faster, more efficient and more cost-effective. The FRAMECAD System is a modern method of construction offering a faster way to design and build strong, durable Cold Formed Steel (CFS) frame buildings easily and efficiently, anywhere in the world.

  • The smart choice to produce a fast, cost-effective and sustainable building

    Building with steel framing is proving the smart choice for architects, developers and builders to produce a fast, cost-effective and sustainable build.

  • Austruss: Build bathroom pods and modular construction by CFS frames and trusses

    We should be doing things better and we should be better at doing what we’re doing”, is the mantra of Australian manufacturers, Austruss, who produce frames and trusses as well as bathroom pods and modular construction.

  • Build Back Better in disaster areas with FRAMECAD

    With natural disasters affecting some of the most vulnerable communities across the world, Build Back Better and Safer principles are becoming increasingly important for rebuilding or strengthening buildings in affected areas and protecting the community against excessive damage from future disasters. The FRAMECAD system and the Mobile Factory offers a quick, easily transportable solution to companies and communities looking to rebuild using Build Back Better and Safer principles. Here is just one example of when that’s made a real difference to a community.

Previous of 10 Next
Page 3 of 10
Share this page
  1. Home
  2. Construction
  3. Customer Stories
  4. Mariposa VII, a 7-storey multi-family building