Having made the switch to FRAMECAD’s automated construction system in April 2016, prefabricated steel framing experts SBS Group have used their FRAMECAD system to make significant savings for their customers whilst delivering an accelerated construction process.
From their purpose-built manufacturing facility in Chirnside Park, Melbourne Australia SBS Group have become well known for their apartment and town house projects. The following projects have shown how using the design-led methodology, the team of talented engineers and detailers at SBS have been able to improve the design and deliver a premium result.
The Langdon Apartments in New South Wales are a great example of how SBS Group's experience and expertise has delivered an amazing result for a challenging site and design. View the Case Study below and discover how SBS Group can provide the tools to help developers Build Smarter.
Geared to attract local residents, Sagebrush is a 90-unit building nestled in the foothills of East Gros Ventre Butte and overlooking Flat Creek. Perfectly situated near downtown Jackson, Sagebrush aims to be one of the most popular complexes in the area — and a project Douglass Colony was proud to work on.
When FrameTech Systems outgrew their existing manufacturing facility, they knew it was time for a bigger, more flexible space. As experts in cold formed steel (CFS) construction, they also knew exactly which method they would use to bring that space to life. So how did their award-winning CFS facility come to fruition?
Having made the switch to FRAMECAD’s automated construction system in April 2016, prefabricated steel framing experts SBS Group have used their FRAMECAD system to make significant savings for their customers whilst delivering an accelerated construction process.
SBS Group are continuously working to deliver exceptional results for their customers in a fast and effective manner. The Langdon Apartments are another great example of their dedication to providing accurate, high quality Cold Formed Steel solutions.