SilverFalcon: residential housing

"The system is cost-effective, so budgets go further. Our clients can create more housing for the same money. And you do it in a much faster time, so you cut labour costs. You also save on delivery costs, because you can flat-pack a lot more steel trusses onto a truck. You’re scoring all the way."

Date: 05 Nov 2018

SilverFalcon: residential housing

Consistent speed and quality

For construction components company Silver Falcon Trading, moving from timber to steel roof trusses has lifted productivity, reduced waste and trimmed transport costs.

Silver Falcon recognised that making the change from timber to light gauge steel would help them to achieve more in less time. Vernon van der Westhuizen, General Manager of Silver Falcon, explains. “We changed to steel due to the quantities we have to put out. Using steel is a better, faster option and the quality is consistent.”

A Streamlined Operation

Initially, Silver Falcon chose FRAMECAD’s low volume turnkey solutions for residential construction. Two months later, they added a second higher volume manufacturing plant upgrading the operation to a mid volume turnkey factory solution to expand the types of steel frame buildings Silver Falcon can offer. In each case, implementation and training was complete within three weeks.

Silver Falcon is currently using the FRAMECAD system to build roof trusses for the huge Soshanguve housing development near Pretoria, and others like it. The FRAMECAD manufacturing solutions are running all day every day. “The transition from timber to steel was no problem on gable roofs,” says Vernon.

“The system is cost-effective, so budgets go further. Our clients can create more housing for the same money. And you do it in a much faster time, so you cut labour costs. You also save on delivery costs, because you can flat-pack a lot more steel trusses onto a truck. You’re scoring all the way.”

Features and benefits

  • FRAMECAD System’s end-to-end solution streamlined the transition from timber to steel framing
  • A dedicated truss machine enabled a higher output of steel trusses
  • Moving to FRAMECAD helped Silver Falcon achieve a higher volume output in less time

More Customer Story

Previous of 10 Next
Page 2 of 10
  • Mariposa VII, a 7-storey multi-family building

    All 422 load-bearing wall panels for levels three through seven of this 7-story (five levels on two levels of podium) project was fabricated at Douglass Colony's headquarters in Commerce City using FRAMECAD and shipped directly to the jobsite where the building was erected in a total of 40 working days, including all wall panels, flooring systems, and detailing with concrete poured and cured.

  • Dynamic Steel Frame - Creating Australia’s largest LGS apartment building

    Dynamic Steel Frame hold the honour of having constructed the largest light-gauge steel (LGS) three storey apartment building in Australia using the FRAMECAD System. Located in the inner-western suburb of Yarraville, Melbourne, this three-level residential building illustrates how LGS is changing today’s approach to construction

  • Intellisteel’s onsite methodology successfully delivers another assisted living facility

    In the US, the framing industry is changing rapidly. Concrete contractors are becoming a rarity and timber continues to offer challenges due to inferior material and a lack of availability. These days, US construction companies are turning more and more to cold-formed steel (CFS), and FRAMECAD partner Intellisteel is revolutionizing how these steel framed structures are built.

  • How FRAMECAD software integrates with 3D scanning

    There are a great many benefits to be found when the decision is made to undertake off-site fabrication of partitioning walls through the use of FRAMECAD technology, rather than traditional on-site timber or stud track construction methods.

Previous of 10 Next
Page 2 of 10
Share this page
  1. Home
  2. Construction
  3. Customer Stories
  4. SilverFalcon: residential housing