The TM300iT has been specially developed as part of the FRAMECAD optimized truss manufacturing system. It produces 75mm standard size C-section trusses designed specifically for maximum strength at minimum cost.
Boasting a automated high line speed up to 2,880m/hr the TM300iT holds the industries highest performing truss output rate.
|
|
|
|
|
|
Flexible, reliable commercial storage and warehousing needs to be built rapidly and affordably to respond to growth. The FRAMECAD System provides everything required to implement this type of commercial construction – from building design to manufacture and onsite training.
FRAMECAD allows developers to meet tight deadlines without compromising on quality. By supplying rapidly constructed framing components, developers can enjoy the benefits of cost-effective high density construction.
The rapid, modern steel frame construction offered by FRAMECAD helps local and central governments construct quality, economical institutional buildings for their communities. Leveraging global reach and experience, FRAMECAD works directly with these agencies and with developers and contractors.
Residential housing takes many architectural forms. The versatility of Cold Formed Steel makes it ideal for construction of simple and challenging designs
This school and community had the large project to rebuild the school and associated buildings after cyclone Winston hit Fiji in February 2016. The right construction method needed to be fast and RESILIENT to withstand a category 5 cyclone which is why FRAMECAD was chosen.
The project 30-day deadline wouldn’t have been possible without FRAMECAD’s cold formed steel technology.
This project took 10 days to complete from the time of starting production to the installation of all the frames, utilizing only 6 men in total.
For Steel Tech Group, cold formed steel & the FRAMECAD system allowed this 42-unit multi-family development to be built faster, with less labor required.
Douglass Colony used the FRAMECAD system to deliver this 90-unit project in just 4 months — a truly impressive accomplishment for any project of this size.