A multi-profile solution for flooring and framing construction, the ideal solution for producing light gauge steel framing and flooring profiles with sizes between 92mm (3⅝" ) and 305mm (12"). Built to handle 0.95 – 2.00mm (20 - 14ga) base metal thickness (BMT), the ST900iT can be used in buildings where structural strength is required.
The ST900iT is a multi-profile solution for floor and frame construction. It's the ideal solution for producing from multi-level construction including heavy high walls, heavy trusses as well as heavy flooring and a short span flooring.
|
|
|
|
|
|
A multi-profile solution for floor and frame construction, and the ideal solution for producing cold formed steel framing and flooring profiles the ST Series uses FRAMECAD patented technology to give a smart lean design, engineering and fabrication process.
CFS construction allows developers to meet tight timelines without compromising on quality and allows fast construction of Mid-Rise buildings including apartments, commercial office buildings, hotels, aged care facilities and more.
FRAMECAD allows developers to meet tight deadlines without compromising on quality. By supplying rapidly constructed framing components, developers can enjoy the benefits of cost-effective high density construction.
The rapid, modern steel frame construction offered by FRAMECAD helps local and central governments construct quality, economical institutional buildings for their communities. Leveraging global reach and experience, FRAMECAD works directly with these agencies and with developers and contractors.
Remove the inaccuracies and material waste of traditional CFS stud and track framing and timber systems. Implementing the FRAMECAD system saves time on site and allows precise installation of internal partitioning, apartment and commercial office walls. Engineered to achieve code compliant fire and acoustic ratings, the FRAMECAD system is easy to specify and install.
What is design lead technology and how does it improve the construction process? This informative video on the FRAMECAD construction methodology explains all.
The project 30-day deadline wouldn’t have been possible without FRAMECAD’s cold formed steel technology.
This project took 10 days to complete from the time of starting production to the installation of all the frames, utilizing only 6 men in total.
For Steel Tech Group, cold formed steel & the FRAMECAD system allowed this 42-unit multi-family development to be built faster, with less labor required.
Douglass Colony used the FRAMECAD system to deliver this 90-unit project in just 4 months — a truly impressive accomplishment for any project of this size.