As a dedicated roll-forming machine for web joists, the J325iT features additional punching blocks to manufacture up to 40% faster than the rest of the F325iT range. The J325iT allows roll formers to operate a focused web joist line whilst other machines focus on framing and trusses.
The J325iT is an intelligent choice to ensure maximum production efficiency.
|
|
|
|
|
|
FRAMECAD has created the world’s most efficient design and manufacturing technology for floor joist construction as well as steel trusses.
CFS construction allows developers to meet tight timelines without compromising on quality and allows fast construction of Mid-Rise buildings including apartments, commercial office buildings, hotels, aged care facilities and more.
Residential housing takes many architectural forms. The versatility of Cold Formed Steel makes it ideal for construction of simple and challenging designs
FRAMECAD allows developers to meet tight deadlines without compromising on quality. By supplying rapidly constructed framing components, developers can enjoy the benefits of cost-effective high density construction.
The highly accurate and accelerated production of the FRAMECAD system means that walls, trusses and joists can be prefabricated off site at rapid speed. The streamlined FRAMECAD roll forming equipment takes up minimal space and allows for easy assembly.
Ben Hatcher, from the New Zealand building company Team Builders 2000, talks about the benefits and advantages of using light gauge steel framing, and why he enjoys working with the FRAMECAD team.
The project 30-day deadline wouldn’t have been possible without FRAMECAD’s cold formed steel technology.
This project took 10 days to complete from the time of starting production to the installation of all the frames, utilizing only 6 men in total.
For Steel Tech Group, cold formed steel & the FRAMECAD system allowed this 42-unit multi-family development to be built faster, with less labor required.
Douglass Colony used the FRAMECAD system to deliver this 90-unit project in just 4 months — a truly impressive accomplishment for any project of this size.