A recent project was awarded to Pre-Engineered Building and Panel specialists Système Panneaux Sandwich (SPS) to construct two 315m2 pre-engineered commercial warehouses.
The construction market in Algeria is not too dissimilar to anywhere else in the world; speed of construction, cost of labor, and materials play heavily into who is awarded contracts for new projects. A recent project was awarded to Pre-Engineered Building and Panel specialists Système Panneaux Sandwich-Pre-Engineered Building Specialists (SPS) to construct two 315m2 pre-engineered commercial warehouses. Utilizing cold formed steel and the FRAMECAD automated-construction system, SPS delivered an exceptionally fast and affordable solution for their clients.
Two-years ago SPS introduced the FRAMECAD system into their offering; boasting a F325-iT and the high performing PEB300. Through this, coupled with FRAMECAD Structure and FRAMECAD Detailer, SPS have strengthened their use of a factory-built offsite construction methodology, whilst shipping transportable components to site for assembly and erection.
Having witnessed how traditional construction methodologies can lead to delays on-site, whilst also incurring additional material and labour costs, the team at SPS knew that adopting a highly efficient and accurate system was crucial to their overall business success.
Following confirmation of the final design and detailing, it was time for manufacturing.
“Our production team erects buildings in two phases,” shares Islem Saber of SPS. “First we make the prefabricated panels and posts in our factory, and then we erect them on site using a mobile crane.”
A number of client changes throughout the production process could have presented challenges to the team. But due to the nature of FRAMECAD manufacturing software, the production team were able to adapt the framing layout manually in the machine and on the FRAMECAD data file for instant roll forming.
Employing a maximum of eight staff on-site at any time, SPS were able to complete the two large, pre-engineered commercial buildings in only 30 days – from design all the way to erection. Not only did they complete the build in less than a third of the time of traditional methods, they also saved their clients 4/5th of the costs whilst improving their own return on investment.
So, what was the highlight for SPS whilst building these six-metre high commercial warehouse? Using their new FRAMECAD PEB300 machine.
“This was the first warehouse created by SPS on the PEB300 using 100% cold formed steel. FRAMECAD organised training in Dubai for the machine, as well as their technology park in Auckland, New Zealand. The ongoing support from FRAMECAD is great.”
With a happy client and a rapid method of construction, SPS certainly aren’t moving away from cold formed steel anytime soon.
“Cold formed steel is the best method of construction for me because of its reduced costs compared to other methods, the rapidity of erection, and its ability to be used for any type of building, whether residential or industrial,” explains Islem. “It reduces the cost of construction in Algeria and has increased our annual production rate.”
However, alongside SPS’s commitment to cold formed steel comes an appreciation for the support that helps them complete so many projects so effectively.
“We love working with FRAMECAD because they provide accompaniment to their clients from the engineering phase right through to manufacturing and erection on site. Their products also allow us to realise our projects within a short time, helping us be competitive in the market.”
Geared to attract local residents, Sagebrush is a 90-unit building nestled in the foothills of East Gros Ventre Butte and overlooking Flat Creek. Perfectly situated near downtown Jackson, Sagebrush aims to be one of the most popular complexes in the area — and a project Douglass Colony was proud to work on.
When FrameTech Systems outgrew their existing manufacturing facility, they knew it was time for a bigger, more flexible space. As experts in cold formed steel (CFS) construction, they also knew exactly which method they would use to bring that space to life. So how did their award-winning CFS facility come to fruition?
Having made the switch to FRAMECAD’s automated construction system in April 2016, prefabricated steel framing experts SBS Group have used their FRAMECAD system to make significant savings for their customers whilst delivering an accelerated construction process.
SBS Group are continuously working to deliver exceptional results for their customers in a fast and effective manner. The Langdon Apartments are another great example of their dedication to providing accurate, high quality Cold Formed Steel solutions.