SilverFalcon: residential housing

"The system is cost-effective, so budgets go further. Our clients can create more housing for the same money. And you do it in a much faster time, so you cut labour costs. You also save on delivery costs, because you can flat-pack a lot more steel trusses onto a truck. You’re scoring all the way."

Date: 05 Nov 2018

SilverFalcon: residential housing

Consistent speed and quality

For construction components company Silver Falcon Trading, moving from timber to steel roof trusses has lifted productivity, reduced waste and trimmed transport costs.

Silver Falcon recognised that making the change from timber to light gauge steel would help them to achieve more in less time. Vernon van der Westhuizen, General Manager of Silver Falcon, explains. “We changed to steel due to the quantities we have to put out. Using steel is a better, faster option and the quality is consistent.”

A Streamlined Operation

Initially, Silver Falcon chose FRAMECAD’s low volume turnkey solutions for residential construction. Two months later, they added a second higher volume manufacturing plant upgrading the operation to a mid volume turnkey factory solution to expand the types of steel frame buildings Silver Falcon can offer. In each case, implementation and training was complete within three weeks.

Silver Falcon is currently using the FRAMECAD system to build roof trusses for the huge Soshanguve housing development near Pretoria, and others like it. The FRAMECAD manufacturing solutions are running all day every day. “The transition from timber to steel was no problem on gable roofs,” says Vernon.

“The system is cost-effective, so budgets go further. Our clients can create more housing for the same money. And you do it in a much faster time, so you cut labour costs. You also save on delivery costs, because you can flat-pack a lot more steel trusses onto a truck. You’re scoring all the way.”

Features and benefits

  • FRAMECAD System’s end-to-end solution streamlined the transition from timber to steel framing
  • A dedicated truss machine enabled a higher output of steel trusses
  • Moving to FRAMECAD helped Silver Falcon achieve a higher volume output in less time

More Customer Story

of 10 Next
Page 1 of 10
  • 388 Lonsdale St

    When it comes to designing, prefabricating, and delivering cold formed steel(CFS) wall frames, roof trusses, floor joists, panels and more, Dynamic Steel Frame is an innovative cold formed steel framing company that utilise the automated construction technology system from FRAMECAD. So, perhaps it’s no surprise then that they took on the single largest CFS flooring cassette project ever completed

  • Light Gauge Steel - SBS Group's top choice for top levels

    For multi-level buildings, it’s becoming increasingly obvious that timber, concrete, and hot-rolled steel aren’t always the best options – especially when it comes to the top floor. That’s why so many developers are now looking for ways to save on time, labour, and costs during the construction process.

  • Mariposa VII, a 7-storey multi-family building

    All 422 load-bearing wall panels for levels three through seven of this 7-story (five levels on two levels of podium) project was fabricated at Douglass Colony's headquarters in Commerce City using FRAMECAD and shipped directly to the jobsite where the building was erected in a total of 40 working days, including all wall panels, flooring systems, and detailing with concrete poured and cured.

  • Dynamic Steel Frame - Creating Australia’s largest LGS apartment building

    Dynamic Steel Frame hold the honour of having constructed the largest light-gauge steel (LGS) three storey apartment building in Australia using the FRAMECAD System. Located in the inner-western suburb of Yarraville, Melbourne, this three-level residential building illustrates how LGS is changing today’s approach to construction

of 10 Next