“The FRAMECAD System has saved our clients hundreds of thousands in construction costs … to say the least, our clients have been very impressed with the speed and quality of our work.”
A FRAMECAD Mobile Factory was deployed at Bagram Air Force base in 2011, revolutionising how buildings are constructed in the city-sized military facility. By changing the original design of the buildings and using FRAMECAD technology, RELYANT provided the usable space of five buildings in four, reduced material costs by 30% and cut down build time by nearly a third.
According to Kyle Michel, FRAMECAD consultant on the project, “The buildings were originally designed as half round structures, but the usable space was limited because of the arch. By redesigning them, we were able to get the space that was the equivalent of the client having to build five of these half round buildings versus four storehouses using the FRAMECAD system.”
RELYANT Country Manager for Afghanistan, Jim Hoven explains: “The FRAMECAD system has saved our clients hundreds of thousands in construction costs, provides more usable space inside these types of structures, and also fulfills the engineering and building authority requirements of traditional construction. To say the least, our clients have been very impressed with the speed and quality of our work.”
“In the bidding stage for this project, FRAMECAD were extremely helpful,” says Jim. “They developed the plans, they developed the actual drawings. They came over to Afghanistan and brought some real hands-on experience. Undeniably, our partnership with FRAMECAD has been a key factor in securing our success in light-steel frame construction.
“The versatility of the FRAMECAD System ultimately convinced us to choose FRAMECAD,” says Jim. “The ability to design a structure, load the drawing into the factory software, and have it produce the components quickly was ideal for construction in an austere environment.
“The mobile frame making factory, the steel, the fixings, the roofing machine, the training … It was a true total solutions approach. And the factory was easy to set up. We shipped it in and we had it commissioned into production within three days. With its own diesel generator and shelter, this machine can be shipped to even the most remote areas with little or no infrastructure to support it. This adaptability to its surroundings complements our expeditionary support services in environments such as the Middle East and Africa.”
Geared to attract local residents, Sagebrush is a 90-unit building nestled in the foothills of East Gros Ventre Butte and overlooking Flat Creek. Perfectly situated near downtown Jackson, Sagebrush aims to be one of the most popular complexes in the area — and a project Douglass Colony was proud to work on.
When FrameTech Systems outgrew their existing manufacturing facility, they knew it was time for a bigger, more flexible space. As experts in cold formed steel (CFS) construction, they also knew exactly which method they would use to bring that space to life. So how did their award-winning CFS facility come to fruition?
Having made the switch to FRAMECAD’s automated construction system in April 2016, prefabricated steel framing experts SBS Group have used their FRAMECAD system to make significant savings for their customers whilst delivering an accelerated construction process.
SBS Group are continuously working to deliver exceptional results for their customers in a fast and effective manner. The Langdon Apartments are another great example of their dedication to providing accurate, high quality Cold Formed Steel solutions.