Gypsteel & FRAMECAD: FIFA World Cup Media Centre

“Thanks to the IBC, the images from the World Cup will reach half the world’s population.” Luis Feranandes, Brazil’s Deputy Sports Minister”

Date: 07 Nov 2018

FIFA World Cup Media Centre

Despite overwhelming deadline pressures and highly constrained construction parameters, the creation of the International Broadcast Centre (IBC) in Rio de Janeiro was one World Cup project that went entirely to plan.

The IBC was the media hub for hundreds of journalists and broadcast stations throughout the 2014 FIFA World Cup. With a cumulative global audience for the live matches of billions, and millions of dollars worth of investment from keen and demanding sponsors, the centre housed over 80 international media organisations for the duration of the world’s most highly viewed single event sporting competition, and was widely acclaimed as one of the most successful projects undertaken.

Innovative Partition System

Because the IBC had to be created within an existing event stadium and no permanent fixtures could be attached to the existing structure, Gypsteel and FRAMECAD collaborated to design and produce a bespoke demountable partition system. The partition system was comprised of structural steel framing and orientated strand board (OSB), a material which provided the necessary impact resistance and is reusable.

FIFA Chooses Sustainable Quality

FIFA wanted a solution which was environmentally sustainable, strong and could be produced within a short on-site construction period, so structural cold form steel framing had a distinct advantage from the outset.

“We were awarded the project following a design competition by FIFA. They chose the best technical solution regarding the speed and quality of product,” says the Gypsteel project manger.

“It was a long journey, which included offering different options and approaches to the FIFA Architectural and Engineering Committee to achieve a technical solution, and then fabricating and erecting a prototype for final FIFA approval.”

The project was awarded the “Green Project” award by FIFA, an award that recognized that using sustainable products like steel and the reusable aspect of the demountable partition system contributed to the overall sustainability of the FIFA World Cup 2014. Our project was recognised as one of the best projects in terms of cost, quality, delivery, schedule, and minimum waste,” says the Gypsteel project manager.

A Fast, Flexible System

The biggest challenge was to build freestanding structures without anchoring or attaching them to the floor or ceiling in any way.

The flexibility of the cold form FRAMECAD System meant that Gypsteel were able to create structures including walls up to 9 meters tall, walkways, bridges and cable tray support. The designs also included partially exposed structural steel framing, which allowed for a atheistically pleasing design elements that fitted well with the existing building.

Gysteel

Gypsteel has been using FRAMECAD technology in Brazil for over seven years, and their clients include many of the country’s largest construction and development companies as well as state governments.

Using FRAMECAD technology meant we could meet the deadline of 28,000m² of partitions erected in 6 months.

The FRAMECAD System means that framing can be pre-fabricated off site and erected on-site, reducing the on-site time required. Gypsteel were only allowed 6 months on-site construction time. By pre-fabricating the framing at their own factory ahead of this 6 month allowance, they were able to meet the tight on-site construction deadline.

More Customer Story

Previous of 10 Next
Page 5 of 10
  • FASTSTEEL’S mission to help rebuild better in Chile

    In Chile, a country prone to high-magnitude earthquakes, builders are consistently seeking materials to support seismically-stable designs. Responsible Chilean builders have long understood the necessity of a sound structural design, often using state-of-the-art technologies and products to ensure construction is safe beyond the minimal building code requirements. But typically, the safest construction options are pricey and time consuming, resulting in project delays and compromises for lower quality materials.

  • Gypsteel & FRAMECAD: FIFA World Cup Media Centre

    Brazil’s Gypsteel and New Zealand’s FRAMECAD were at the centre of worldwide media attention at the 2014 FIFA World Cup, having created a state-of-the-art communications hub in record time under extremely challenging conditions.

  • US Navy Explores Cold Formed Steel Framing

    Click on this link to view a video in which the US Naval Post Graduate School discuss their recent successes in investigating cold formed steel framing as a method of rapid construction.

  • Foshan Tuhe: Residential in China

    Wanting to develop a range of sample houses that would demonstrate their breadth of capabilities, Foshan Tuhe Equipment Co. Ltd in China came up with three designs that they knew would appeal to and meet the needs of different groups within the local market.