Fitzroy Frames: social housing

“The assembling, screwing, stacking and loading of the end product onto the truck, ready to go, can all be done easily by low skilled or even unskilled labour.”

Fitzroy Frames: social housing

Up and running

Eric believes the FRAMECAD Mobile Factory was the perfect solution for getting a factory up and running quickly in such an isolated area. “Being out in the middle of nowhere, the FRAMECAD Mobile Factory suited us just fine because it came with everything we needed and there was no guesswork. We just wanted be able to turn the key and make frames and that’s exactly what happened.

“We had a lot of on-the-ground help from FRAMECAD people, and once the machine was operational and I’d made a few frames, any question marks about the machine’s performance were quickly dispelled. I’m really happy with the machine, absolutely, 100 per cent.

“There have been some small teething problems, but every time I pick up the phone to FRAMECAD, they are always ready to help out and have always got the answers for any problems we might have.”

Keeping the labour local

Fitzroy Frames was initially established to assist with a state government programme to build housing for the indigenous Australians in the vast Kimberley region. As well as providing framing for indigenous homes in the region, Fitzroy Frames is also actively involved in providing indigenous people with skill training and employment opportunities.

Explains Eric: “We make a point of using indigenous labour wherever we can and it’s working out well. We’ve taken on quite a few, teaching them, encouraging them. The assembling, screwing, stacking and loading of the end product onto the truck, ready to go, can all be done easily by low skilled or even unskilled labour.”

Before FRAMECAD Mobile Factory, steel frames had to be trucked in from Perth more than 2500 km away. “Now we don’t have to rely on sub-contractors; there are no delays, we don’t have to put up with excuses. It means we have much greater control.” Eric believes his “factory in the middle of nowhere” has a huge future in the region due to its flexibility and agility, and he is already planning to expand.

Features and benefits

  • FRAMECAD System has accelerated production and increased factory capacity
  • The Mobile Factory can move to where new projects are needed
  • No need to rely on sub-contractors, results in cost savings and fewer delays

More Customer Story

Previous of 10 Next
Page 3 of 10
  • FRAMECAD and Intellisteel Partner for Disruption

    A partnership between FRAMECAD and Intellisteel is poised to disrupt the construction industry in the U.S. for years to come. Together, these two innovative companies make construction faster, more efficient and more cost-effective. The FRAMECAD System is a modern method of construction offering a faster way to design and build strong, durable Cold Formed Steel (CFS) frame buildings easily and efficiently, anywhere in the world.

  • The smart choice to produce a fast, cost-effective and sustainable building

    Building with steel framing is proving the smart choice for architects, developers and builders to produce a fast, cost-effective and sustainable build.

  • Austruss: Build bathroom pods and modular construction by CFS frames and trusses

    We should be doing things better and we should be better at doing what we’re doing”, is the mantra of Australian manufacturers, Austruss, who produce frames and trusses as well as bathroom pods and modular construction.

  • Build Back Better in disaster areas with FRAMECAD

    With natural disasters affecting some of the most vulnerable communities across the world, Build Back Better and Safer principles are becoming increasingly important for rebuilding or strengthening buildings in affected areas and protecting the community against excessive damage from future disasters. The FRAMECAD system and the Mobile Factory offers a quick, easily transportable solution to companies and communities looking to rebuild using Build Back Better and Safer principles. Here is just one example of when that’s made a real difference to a community.

Previous of 10 Next
Page 3 of 10
Share this page
  1. Home
  2. Construction
  3. Customer Stories
  4. Fitzroy Frames: social housing