Corporacion Waraira: A Venezuelan residential development

“We searched and studied many solutions that existed throughout the world based on 4 parameters: cost, speed, adaptability and quality, and the one that most fitted our needs was cold formed steel framing ...”

Date: 05 Nov 2018

A Venezuelan residential development

The Build

For this six building residential development project, Corporacion Waraira entered the scene while the owner of the development project was being heavily delayed by problems surrounding the casting of the foundation. Worker and supply problems typical to the area had put them behind schedule and they needed the erection and assembling of the structures to go as smoothly as possible. Using FRAMECAD technologies, including steel materials, machines for the steel framework, as well as design technology, Corporacion Waraira was able to design, produce and pre-assemble the frame, then get on site and assemble the structure and flooring in 10 days with only 8 workers.

“With a minimum of waste and minimum field equipment, his time problem disappeared,” says David. In another 20 days, the external cladding, sheeting and roofing were done. Not only were they back on schedule thanks to the efficiency of FRAMECAD’s system, and the expertise Corporacion Waraira had gained from working with them, the entire job was finished in less time that had been previously anticipated.

In fact, the main challenge of the project arose when they found they were moving much faster than the local contractors were used to. “The plumbing and electrical contractors simply did not believe us when we told them the entire structure erection, along with the first storey flooring system, were to be done in a week and a half,” David reveals. The contractors delayed for 2 weeks and Corporacion Waraira had to slow their pace, as by that time, all the external cladding and roofing had been completed. The contractors also had to speed up their internal affairs in order to match up to an earlier than expected completion time.

There were problems facing the first house. By the sixth house, everyone had learnt a new, faster way of doing things.

The Result

The project overcame worker and supply problems, and a political landscape that is problematic for construction and development, to come out finishing faster than expected, cost effectively, and at a competitive price. Corporacion Waraira’s client could benefit more from their investment as they did not lose out on even more profits due to the rapidly fluctuating and huge inflation rates. Political and economic landscapes such as the one in Venezuela can be found in developing countries across the world and a quicker solution to all types of construction like steel framing is one of the most promising solutions to real estate shortages.

The Future

For Corporacion Waraira, internationally owned by Frameland, the flagship client for FRAMECAD in Central and South America, the success of this project and others before has it has grown the company into a position where they can now export their services to nearby countries that face the same real estate development challenges that FRAMECAD’s system has proven to be able to solve. With a relationship built on trust that has lasted for multiple years, FRAMECAD’s regional offices provide constant support to Corporacion Waraira and other clients like them.

For FRAMECAD, these projects offer a chance to provide alternative options and expertise to the development scene in new markets across the world. These projects show that the FRAMECAD system is easily able to adapt to residential construction and help overcome pressing development issues that arise across the world.

More Customer Story

of 9 Next
Page 1 of 9
  • Light Gauge Steel - SBS Group's top choice for top levels

    For multi-level buildings, it’s becoming increasingly obvious that timber, concrete, and hot-rolled steel aren’t always the best options – especially when it comes to the top floor. That’s why so many developers are now looking for ways to save on time, labour, and costs during the construction process.

  • Mariposa VII, a 7-storey multi-family building

    All 422 load-bearing wall panels for levels three through seven of this 7-story (five levels on two levels of podium) project was fabricated at Douglass Colony's headquarters in Commerce City using FRAMECAD and shipped directly to the jobsite where the building was erected in a total of 40 working days, including all wall panels, flooring systems, and detailing with concrete poured and cured.

  • Dynamic Steel Frame - Creating Australia’s largest LGS apartment building

    Dynamic Steel Frame hold the honour of having constructed the largest light-gauge steel (LGS) three storey apartment building in Australia using the FRAMECAD System. Located in the inner-western suburb of Yarraville, Melbourne, this three-level residential building illustrates how LGS is changing today’s approach to construction

  • Intellisteel’s onsite methodology successfully delivers another assisted living facility

    In the US, the framing industry is changing rapidly. Concrete contractors are becoming a rarity and timber continues to offer challenges due to inferior material and a lack of availability. These days, US construction companies are turning more and more to cold-formed steel (CFS), and FRAMECAD partner Intellisteel is revolutionizing how these steel framed structures are built.

of 9 Next