Build bathroom pods and modular construction by CFS frames and trusses

“We should be doing things better and we should be better at doing what we’re doing”

Date: 05 Nov 2018

Austruss: Build bathroom pods and modular construction by CFS frames and trusses

Andrew Fowler, Managing Director of Austruss and his team, based in Mittigong New South Wales, see innovation at the heart of their business and are proud to be part of the change in Australian construction industry, to manufacture buildings in a more efficient and environmentally-friendly way.

Andrew explains “This industry hasn’t innovated a lot in the last 100 years” and “it’s getting more expensive by the day to undertake projects.” “If we don’t continue to innovate and do things more efficiently, that’s going to be a problem in the long term. We’re going to use more energy and create more pollution because we’re creating things in a more complex manner.”

Part of Austruss’ drive to innovate in a traditional industry is their move into modular construction and bathroom pods, meaning that they can produce all parts of the pod or section of the building in their new factory facility. “In this new facility, what we’ve actually got is a builder’s heaven – under light, without rain, 24 hours a day, without noise restrictions – we’ve got our own substation with 40, 000 V coming in to it” Says Andrew. Austruss have chosen the Framecad System to be at the heart of this new facility, to design and produce the light gauge steel framing used in Austruss’ construction work.

For Andrew, one of the drivers to move into modular construction was the control that this method of building provides, “By trying to control something within a controlled environment, its done the first time and it’s done properly the first time”. The efficiency and precision of the Framecad System also means that wastage is reduced and accuracy assured. Ensuring a high end finished product was also a reason that Austruss have moved to modular construction.

“The quality, the reduction in labour required on site and reduction in materials handling on site – that’s the efficiency that this kind of operation provides to the building industry.” Austruss’ is able to provide a “one stop shop” for builders and assist with all aspects of the construction process. Andrew comments that “We organise all the installation, all the deliveries, all the galvanising; all the other elements that go into building a building all into one process.”

Andrew says “Any business has got to aim to be more streamlined as time goes on, and we got to improve processes to make it better and that’s part of why we’ve gone into modular building, because we’ve seen the gains that we’ve made within this” Andrew and his team have been impressed with the world wide movement towards prefabricated and modular construction, and the increasing uptake of light gauge steel framing and the Framecad System.

“If these other people around the world are doing it, why can’t we do it? People who do things outside of what everyone else are doing are the ones that move forward.”

More Customer Story

Previous of 10 Next
Page 7 of 10
  • NZ Built: residential housing

    Just about everywhere else in the world, steel framing is recognised for its many benefits. You can use low skilled workers to put it together and they can’t mess it up. It’s building by numbers – Meccano construction. Also, it’s ant and termite-proof.

  • Tauranga single storey residential building

    The main challenge of this construction was the complexity of the veranda roof design with overhangs, different roof heights and the main roof structure which did not line up with the veranda roof.

  • SilverFalcon: residential housing

    The system is cost-effective, so budgets go further. Our clients can create more housing for the same money. And you do it in a much faster time, so you cut labour costs. You also save on delivery costs, because you can flat-pack a lot more steel trusses onto a truck. You’re scoring all the way.

  • Cold Formed Steel: A safer choice for seismic regions

    It was the most practical solution to an urgent problem to get some facilities up and running as quickly and simply as possible. I sent the plans the next day and they immediately went ahead and built quite a number of these units in a very short space of time